WTG commissioning test

We carry out wind turbine generator commissioning tests.

Commissioning tests of wind turbine generator are neccessary to check and enshure safe and long term operation of the generator.

Commissioning tests Wind Turbine Generator (WTG) contains:

  • 6 hour test run of the generator connected to the grid
  • checking the WTG vibration level to be below acceptable level
  • test of WTG tripping while generating when grid is lost
  • test of WTG over speed tripping
  • yaw drives test
  • test of WTG Power Measurement System
  • Checking of settings for the electrical protection relays